/ The build
6″ Reinforced 75 × 100 Concrete Slab
A seventy-five-by-one-hundred reinforced slab in Stillwater — seven thousand five hundred square feet of flatwork ready to receive a future shop. Double rebar mat, properly graded sub-base, and anchor bolts set on layout so the building goes up plumb when the steel arrives.
/ Key features
- 7,500 sq ft of reinforced flatwork
- 6″ slab with double rebar mat
- Site graded and compacted
- Anchor bolts set for future steel building
